Start at the tenancy boundary
For a city office, the building lobby, lift and tenancy entrance may be managed by different parties. Establish which doors are in scope and obtain the building manager’s requirements before ordering hardware.
Make installation windows practical
Riser access, inductions, loading arrangements and permitted work hours can shape the programme. Share these conditions early so cabling and door work can be coordinated with the building.
A site-based scope
We assess each premises rather than assuming a standard solution fits every office. Include the entry layout, current intercom and any shared-building restrictions in your enquiry.

